The costs and timelines for installing wall-mounted chargers at terminal users’ homes can vary widely based on several factors such as the region (EU vs. South America), the type of charger, the power requirements, and local regulations. Here’s a breakdown of key elements:
-
Power Transformation Costs:
Power transformation refers to the conversion of electrical supply to the correct voltage and amperage needed for charging. In general, the following costs are associated with power transformation:
Transformer and Circuit Upgrade: If a transformer or circuit upgrade is required to support high-power charging (e.g., fast chargers), costs can range from €300 to €2,000 (EU) or $500 to $3,000 (South America) depending on the complexity of the installation.
Electrical Panel Upgrade: A dedicated circuit breaker or electrical panel may need to be installed to avoid overloading the system, which can cost an additional €100 to €1,500 (EU) or $200 to $2,000 (South America).
Electrician Fees: Professional fees for electricians to ensure proper wiring and safety compliance might range from €50 to €100 per hour (EU) or $50 to $150 per hour (South America).

-
Charger Costs:
Wall-Mounted EV Charger: The charger itself typically costs between €500 and €1,500 (EU) or $600 to $1,800 (South America), depending on brand, charging speed (Level 2 or DC fast charging), and features (e.g., Wi-Fi connectivity).
Installation Cost of Wall-Mounted Charger: The installation could range from €200 to €1,000 (EU) or $300 to $1,200 (South America), depending on local rates and complexity of installation (e.g., distance from electrical panel, wall mounting, etc.).
-
Installation Cycle and Timeline:
Pre-installation Phase: Before installation, a site survey may be needed to evaluate power availability and charger placement. This can take 1 to 2 weeks in the EU and 2 to 3 weeks in South America, depending on local availability of professionals.
Installation Timeline:
EU: The installation itself typically takes 1 to 2 days (for a standard residential charger). If power transformation is needed, the process can extend to 1 to 2 weeks.
South America: Installation is typically faster, usually 1 to 2 days, but power transformation or upgrades can take 2 to 3 weeks due to potential supply chain issues or less availability of skilled professionals in some areas.
Post-installation Testing & Commissioning: Testing and commissioning the charger (making sure it works correctly with the home’s electrical system) takes an additional 1 to 2 days in both regions.
-
Regulatory Considerations:
EU: Different EU countries have different regulations, with some requiring specific certifications (e.g., CE marking) and compliance checks by local authorities before the charger can be used. This could add 1-2 weeks to the installation timeline.
South America: Regulations can vary significantly by country, with some countries requiring government inspection or approval. Delays due to these checks may be 1 to 3 weeks.

-
Overall Costs and Timelines:
EU: A typical wall-mounted charger installation with power transformation can cost anywhere from €1,000 to €5,000 and take about 2 to 4 weeks (including all pre-installation and post-installation processes).
South America: The cost could range from $1,200 to $6,000 with a timeline of 2 to 5 weeks depending on complexity.

































PV-Storage-Charging
High & Low Voltage Switchgear
Company Profile
News Information
Service Support
Cloud Platform Customized Development
Leisheng Charging International Platform
Leisn Home Charging Platform