
Commercial & Industrial
Commercial & Industrial
The photovoltaic storage and charging system integrates photovoltaic power generation (with a lifespan of 5-20 years), energy storage batteries (lithium iron phosphate/sodium ions), and intelligent charging piles (120-480kW fast charging), and achieves a 40% increase in daily photovoltaic utilization rate, a 0.3 yuan/kWh reduction in valley electricity storage costs, and a 60% reduction in comprehensive energy consumption of charging stations through an energy management system (EMS).
Target Customers
urban commercial complexes, highway service areas, bus/sanitation stations, ports/airports.

Efficient Solar Energy Utilization
Utilizes solar power to reduce reliance on traditional electricity. Solar energy is clean, eco-friendly, and renewable, supporting sustainable development.

Stable Power Supply
Provides backup power during low solar generation or grid outages. The storage system also helps in peak shaving and valley filling, reducing electricity costs.

Convenient EV Charging
Provides an on-site EV charging station for employees and customers. The system supports intelligent scheduling and remote control, adjusting charging power and timing as needed.

Smart Energy Management
Monitors the PV, storage, and charging systems in real-time. Automatically adjusts operation modes to optimize energy use and efficiency.
Economy
IRR can reach 15-25%, investment payback period of 3-5 years (including subsidies)
Reliability
Off grid mode ensures 8-hour continuous power supply
Low carbon certification
Reduce carbon emissions by 50-200 tons per site per year
Smart operation and maintenance
AI predictive maintenance reduces failure rate by 70%

Collaboration mode
EMC Energy Management Contract: The investor shall bear the equipment and construction costs, and the customer shall pay the fees according to the agreed electricity price. The profit sharing ratio is recommended to be 70% -80% for the investor and 20% -30% for the customer
Operating lease: Provides a flexible lease term plan of 5-8 years, with monthly rent covering equipment depreciation and operation and maintenance costs. Charging piles can be charged by the hour/kWh.
Joint operation: Cooperate with the property management/parking lot to divide the charging amount into tiers.
Pre sales, implementation, and after-sales full cycle service
Pre sales: Free energy audit, 3D visualization solution design, investment return simulation system.
Implementation: 45 day standard construction period, deployment of intelligent monitoring system, and user operation training.
After sales: 24-hour fault response, annual system health check, lifelong monitoring of battery performance.
